local security control).įinally, plans should include sign-off sheet to ensure the plan has been reviewed, inspections are current and proper tests were conducted. Non-crew personnel present during the critical lift (e.g.Equipment Inspections, including dates of completion and name of competent people who completed them.Other sections found in these plans include: Other: If not included on load-patch sketch, a separate sketch showing lifting and speed limitations should be prepared.įortunately, there are a variety of critical lift plans available to review.
#OSHA CRANE LIFT PLAN PROFESSIONAL#
“One who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience has successfully demonstrated ability to solve or resolve problem relating to the subject matter, the work, or the project.” According to the OSHA, a qualified person is: Rigger explains that the critical lift plan should be prepared by a qualified person.
The Occupational Safety and Health Administration (OSHA) defines a critical lift as one to either have a load that exceeds 75% of the crane’s maximum capacity or require more than one crane. The National Institute for Occupational Safety and Health (NIOSH) defines a critical lift to include a load that approaches the maximum capacity (70% – 90%) of the crane, involves two or more cranes, involves the lifting of personnel, use of nonstandard crane configurations, or is in the presence of special hazards. While there is no universal definition for a critical lift, various resources do include similar lift characteristics.
#OSHA CRANE LIFT PLAN HOW TO#
However, some lifts are more dangerous than others, hence the designation of a “critical lift.” Today, we’ll cover the common definitions of a critical lift, and provide guidelines on how to prepare a Critical Lift Plan. Cranes are essential for lifting and moving loads to otherwise inaccessible heights. It’s the duty of construction workers to use equipment to complete large projects.